Navkaar Aluform — Formwork re-engineering & reuse

Redesign · Refabrication · Reuse

Your formwork’s next project starts here.

When a project ends, your aluminium formwork still has life left. Our in-house redesign and refabrication team adapts it to a new tower, a new project or a changed layout, with minimum wastage.

  1. You

    Are you planning to reuse your existing aluminium formwork after your project is completed?

  2. But how do you use it for a different tower or project with a non-identical design?

  3. Navkaar

    We redesign and refabricate it to fit the new drawings, so the panels you already own go back to work.

Why reuse

One project rarely uses up a formwork system.

With proper handling, maintenance and site practices, aluminium formwork is built for many repetitions. Redesigning it for your next project puts that remaining life to work instead of leaving it in the yard.

  • 200+

    Repetitions standard panels can achieve under suitable conditions

  • 100+

    Repetitions as a realistic minimum for non-standard or full-block material

Actual repetitions depend on project design, panel type and site maintenance practices.

When it applies

Same formwork, a different design.

Redesign, refabrication and reuse are subject to an inspection of the available material and the new project’s requirements.

  • A new tower with a different layout

    Move your system from a completed tower to the next one, even when the floor plans don’t match.

  • A different project altogether

    Take formwork from one site to another and have it re-engineered for the new structure.

  • Block changes within a project

    Optimise your existing material when blocks in the same project change, and keep to your timelines.

How it works

From the yard back to the site, in four steps.

  1. 01

    Inspect

    We inspect your available material to see what can be reused.

  2. 02

    Redesign

    Our in-house team redesigns the formwork around the new drawings, making the most of the panels you already own.

  3. 03

    Refabricate

    The material is refabricated to suit the new design, with minimum wastage.

  4. 04

    Reuse on site

    Your system goes back to work, with our technical support through the casting stages.

Getting started

What we need from you.

Send us these and our team will review what can be reused and come back with a solution and quotation.

  • 01Drawings for the new tower or projectArchitectural floor plans, structural framing plans, sections and elevations
  • 02Details of your existing formworkWhat you have and where it is, so we can arrange an inspection
  • 03Your timelineWhen the new project needs the formwork on site

Product catalogue

Every system and accessory, in one PDF.

  • All six aluminium formwork systems
  • 19 components and accessories, with specifications
  • Selected projects and credentials

Get the catalogue

Tell us who you are and your download starts straight away.

We use these details only to follow up on your enquiry.